Building Re-insulation

Re-insulation can place severe demands on heat cost allocators. Changes to a property, such as re-insulation, can all of a sudden make the meters unsuitable.

When meters become unsuitable
Suppose that a building is re-insulated and thereby have its heat loss reduced considerably. Now the building may be heated at a significantly lower radiator temperature. Some heat cost allocators start at a fixed temperature, and they may have problems if the radiator's start temperature is lower than the meter's. In other words, the radiator can be switched on without any consumption recorded. How does the meters work in your building? It appears for instance from the building's control manual.

 
 
 
Overlay

Brunata.dk collects statistics by using cookies. However, they do not reveal who you are, your name or your address. You can say 'no thanks to cookies' by clicking here, but we use a cookie to remember your request. If you want to avoid cookies altogether, you have to block cookies in your browser. Read more about cookies and how you block cookies Activate by clicking here.

This page need to use cookies to work as intended - You should not disable cookies at this moment.

This page works only with cookies - It is required to enable cookies if you want to use this page as intended.

Cookies are currently activated for this website. Activate
by clicking here.